CONSTRUCTION ENGINEER

TECHNICAL OFFICE MANAGER  




EXPERIENCE: (Total 10 years)

a. Summary Site Requirement

- Excellent Knowledge For Reading Drawing and detailing

- Very Good knowledge About pre-installation arrangement

- Very Good knowledge about Construction Planning

- Excellent knowledge about Initiated Inspection

- Good knowledge about Quality Control Conditions

- Excellent knowledge about Quantity Surveyor

- Excellent knowledge about Initiated Daily and Monthly Report

- Excellent knowledge about Initiated Shop Drawing for Construction

- Excellent knowledge about Initiated Material and Drawing Submittal

- Excellent knowledge about Prepare Bending List, Construction Method-Formwork,

Temporary work,..etc-.

b. Major Work

  • Period from Nov 2010 Up To Date

1.Contractor's Technical Office Manager (Main)

2.Contractor’s Construction Manager

 

Project : Prince Sultan Cultural Center (Total Cost 200,000,000 SR)

Location (Earth Google):

24 Deg 42' 59.71" North

46 Deg 37'19.38" East

Client :King Saud University

Consultant :General Military work

Contractor :Al mansouryah establishment

Duty :

-Responsible for detailing the project to engineers.

-Ensure that the construction work done according to Specification and Drawing.

-Discuss with project manager the priority for pouring and construct.

-Discuss with the project manager purchasing requests and its priority.

-Responsible for checking design for all element (Beams,Slab,Column) structurally according to ACI.

-Responsible for shop drawing for concrete dim,bar bending,surveyor, carpenter…..

  • Period from Jan 2008 Up Nov 2010

 

1.Contractor's Technical Office Manager (Main)

2.Contractor’s Construction Manager

3.Do project manger duty from mar 2008 up to aug 2008

 

Project : Central Service Building for King Khaled Hospital (Total cost 97,000,000 SR)

Location (Earth Google):

24 Deg 42' 40.96" North

46 Deg 37'22.10" East

Client :King Saud University

Consultant :Khatib and Alami

Contractor :Al mansouryah establishment

Duty : (finished nearly 8000 cu.m concrete, 5 floor and 2 basement)

-Share project manager coordination between each discipline (Archtictural-HVAC-Plumbing-Electrical) with project manager.

-Share responsability with project manager for coordinate and monthly update the project schedule.

-Responsible for check inspection requests before submit to consultant.

 -Detailing the projects for engineer for construction.

 -Responsible for review and check scafolding design -saudi scafolding (SSF)-and submit it to consultant for approval.

 -Responsible for start up the project (material, equipment,shop drawing..).

 -Responsible for Mobilization (site fence, offices, electrical work, plumbing…).

 -Responsible for shop drawing for surveyor, mason, concrete shuttering,steel rft bending list…..

 -Share project manager prepare material purchase including but not limited steel ,shuttering ,scafolding, pipes, saw machine, polyethylene, tie rod, waterstop, cement, sand….

 -Responsible for Proposal, installation pipe 500mm storm pipe to transfer exist storm tunnel in scope of building.

  • Period from Aug 2007 Up To Dec 2007

     

Contractor’s Construction Engineer

 

Project : Prince Sultan Cultural Center

 

Client : King Saud University

 

Consultant : General Military work

 

Contractor : Al mansouryah establishment

 

Duty :

-Share prepare project schedule and check it with consultant.

 

-Responsible for making bending list for foundation steel approximately 450ton.

 

-Responsible for Initiated inspection request.

 
  • Period from Apr 2007 up to Aug 2007

Employer’s Site Engineer for Egyptian Electric Ministry (Sina zone)

Project :Ras Sedr/Sharm El Shikh High voltage Power Line

Contractor :Kahromica

Duty :

-Responsible for monitor progress

-Responsible for contractor’s invoices

- Ensure that the civil contractor constructs the civil and building works in line with

the design and applicable specifications.

  • Period from Jan 2005 up to Apr 2007

SubContractor’s Technical Office Engineer

Project :Kohafa Waste Water Treatment Plant

Contractor :ABB SUSA

SubContractor :Engineering Construction Company (HINALCO)

Duty :

- Responsible for review calculation sheets for subcontractors.

-Prepare Steel Binding List and Follow up in workshop.

  • Period from Aug 2004 up to Jan 2005

Contractor’s Technical Office Engineer

Project :Kohafa Waste Water Treatment Plant

Contractor :ABB SUSA

Duty : Responsible for review calculation sheets for subcontractors.

 

  • Period from Jul 2003 up to Jul 2004

Employer’s Site Engineer for Egyptian Electric Ministry (Sina zone)

Project :Elarish High voltage S/S

Duty :-Responsible for construct the project.

  • Period from Jun 2002 up to Jul 2003

Employer’s Site Engineer for Egyptian Electric Ministry (Sina zone)

Project :Sharm El Shikh High Voltage S/S

Duty :- supervisor for construction.

-Responsible for review calculation sheet and invoices.

  • Period from Jan 2002 up to Jun 2002

Sub-Contractor’s Technical Office Engineer

Project : Tow Terminal Station for passing cable under SUIS Canal

Main Contractor :Schnider Electric Co.

Sub contractor : Engineering Construction Company (HINALCO)

Duty :-Responsible for quantity survey

-Responsible for prepare binding list

-Responsible for making purchase request

  • Period from Jan 2001 up to Jan 2002

Sub-Contractor’s Technical Office Engineer

Project :New Mansora Water Treatment Plant(consist of 8 building

oxidation,filteration,….) 105,000 cubic meter water treatment per day

Main Contractor :ABB SUSA

Subcontractor :Engineering Construction Company (HINALCO)

Duty :-Prepare Calculation Sheet for invoices and review it with consultant.

  • Period from Jul 2000 up to Jan 2001

Sub-Contractor’s Technical Office Engineer

Project : Fayoum Gas Development Project

Main Contractor : Egyptian Maintenance Co.

Sub contractor : Engineering Construction Company (HINALCO)

Duty :-Responsible for quantity survey.

  • Period from Dec 1999 up to Jul 2000

Sub-Contractor’s Technical Office Engineer

Project :Wadi hof High Voltage S/S

main contractor :ABB high voltage

Sub contractor :Engineering Construction Company (HINALCO)